Two new staircases inside Perth Arena were completed with the aim to integrate with the existing building fabric. Marawar conducted extensive research and identified a new product “Jesmonite” that was being used in Europe, which is as strong as concrete but much lighter for transportation and installation. The material was tinted to match the surrounding podium and fabricated off-site so that the construction could be coordinated around the busy schedule of events happening at Perth Arena.